Ineos Project One
Clients: Ineos, Mourik, MBG, Stadsbader, Martifer, Vanhout, TCS, IBS
More info: Ineos or [email protected]
CISS has been involved in this project from the start and, at the beginning, captured the entire site with drones. Today, several colleagues are still working on this project.
For Ineos:
- Creation of 2D orthophotos
- Installation of modules and equipment
- Stake out of concession boundaries
- Taking project photos and film recordings to document project progress
- Carrying out periodic drone flights of the entire site, continuously creating up-to-date models to distribute to hundreds of users on-site. These models are distributed by Ineos, enabling all stakeholders to stay up-to-date with virtual plans and check or calculate distances, areas, and volumes
- Preparation and maintenance of the project's bench marks, used as a reference to build the site
- Survey control
- Monitoring
For the contractors
- Stake out work
- Installation of anchor bolts before casting
- Installation of modules
- As-built surveys
- Equipment alignment
- Volume measurements
- Stake out of anchor holes
- Monitoring the formwork of the ethane tank